7. ROAD INVENTORY

Rural Roads Inventory:

Legend   :   SG   -   Sub-Grade
        SB   -   Sub-Base
        BC   -   Base Coarse
        PCCP   -   Portland Cement Concrete Pavement
                 
                 
                 
NAME
  NO. OF    TOTAL   NO. OF   SURFACE TYPE (%)   REMARKS
OF   EXISTING   LENGTH   CROSS   SG   %   SB   %   BC   %   PCCP   %    
BARANGAY   ROAD   (KMS)   DRAINS   (KM)       (KM)       (KM)       (KM)        
 Bagonbon   2   17.392    20   5.1   29.32   12.092   69.53           0.2   1.15   1 unit - Single Barrel,
                                                Box Culvert & Triple
                                                Barrel Box Culvert
                                                 
Codocod    13   55.44   63   16.16   29.15   25.64   46.25   13.44   24.24   0.2   0.36   Additional 
                                                Aggregates 
                                                 
Nataban    5   14.93   29   4.36   29.2   6.97   46.69   3.6   24.11           Additional
                                                Aggregates
                                                 
Palampas    4   17.02   50   0   0   4.02   23.62   12.52   73.56   0.48   2.82   Needs Overflow
                                                & Spillway
                                                 
Prosperidad    7   19.62   53   13.48   68.71   6.14   31.29                   Additional  
                                                Aggregates 
                                                 
Punao    5   11.3   29           3.5   30.97   7.8   69.03           Spillway
                                                 
Quezon    9   24.64   39   5.7   23.13   12.6   51.14   4.34   17.61           1 unit - Triple
                                                Barrel,
                                                Box Culvert
                                                 
Rizal    3   10.7   24   6.2   57.94   4.5   42.06                   Additional
                                                Aggregates
TOTAL
  48   171.042    307   51   29.82   75.462   44.12   41.7   24.38   2.88   1.68    
                                                 

Urban Roads Inventory:

ROADS   L E N G T H
  CONCRETE   UNPAVED ROAD   ASPHALT
Brgy. San Juan   5,272.00m.   3,350.00m.    
Brgy. Ermita   4,635.00m.   570.00m.    
             
Total Length of Roads:   9,907.00m.   3,920.00m.    
Total Length of Concrete            
& Unpaved Roads:   13,827.00m.        
Percentage:   71.65%   28.35%    
             
A. San Julio Subdivision
Calchuchi St.   340.78m.        
Excess Road to Highway   89.90m.        
Dahlia St.   259.80m.        
Gumamela St.   259.84m.        
Azucena St.   397.93m.        
Sampaguita St.   330.15m.        
Zenia St.   289.80m.        
Campanilla St.   371.40m.        
Mapa St.   480.13m.        
Caimito St.   447.53m.        
Nangka St.   468.52m.        
Chico St.   380.67m.        
Pili St.   562.40m.        
Casoy St.   190.55m.        
Santol St.   184.40m.        
Jasmin St.   361.50m.        
Ilang-ilang St.   698.67m.        
Avocado St.   209.50m.        
             
Total:   6,323.47m.        
    6 + 323.47 kms.        
             
ROADS    L E N G T H     
  CONCRETE   GRAVEL ROAD   ASPHALT
B. Don Juan Subdivision       
Pres. Quezon St.    175.33m.        
Pres. Laurel St.    138.50m.        
Pres. Garcia St.    150.70m.        
Pres. Quirino St.    162.80m.        
Pres. Osmeña St.    359.87m.        
Pres. Aguinaldo St.    126.40m.        
Pres. Magsaysay St.    256.92m.        
Gen. Romulo St.    115.10m.        
Main Road from            
Magsaysay St.   238.44m.        
             
Total:   1,724.06m.        
    1 + 724.06 kms.        
             
C. Teacher's Village       
Amethyst St.       97.40m.    
Jade St.       70.18m.     
Onyx St.   198.00m.         
Pearl St.       203.00m.     
Ruby St.       400.09m.     
Gold St.   633.80m.         
Sapphire St.   520.00m.         
Silver St.   596.68m.         
Emerald St.       152.04m.     
Diamond St.   118.10m.         
Excess Road   31.32m.         
             
Total:   2,097.90m.    957.88m     
    1 + 577.90 kms.    1 + 477.88 kms.     
             
D. Margarita Subdivision       
Main Road 1(Road Lot #20)   389.00m.        
Main Road 1(Road Lot #12)   360.00m.        
1st Street   200.17m.        
2nd Street       190.13m.    
3rd Street   180.90m.        
4th Street       171.22m    
5th Street   161.87m.        
6th Street   152.49m.        
7th Street   143.14m.        
8th Street   133.77m.        
9th Street   124.32m.        
             
Total:   1,456.66m.   361.35m.    
    1 + 463.39 kms.   746.97m.    
             
E. City Proper       
Cockpit Arena   197.00m.        
New Era St.   398.10m.        
San Juan/Scorpion/Hope   445.10m.        
San Juan Purok Tunga   136.10m.        
San Juan Baybay   52.60m.        
Endrina St.   491.70m.        
Broce St.   1,321.90m.        
Gustilo St.   1,327.23m.        
Ylagan St.   1,083.55m.        
Magsaysay St.   168.55m.        
Caballero Subdivision   271.78m.        
Sumacuel Way   106.85m.        
Azcona St.   610.18m.        
Locsin St.   880.50m.        
Mondragon St.   162.55m.        
Carmona St.   1,074.87m.        
Remedios St.   325.20m.        
Dos Hermanos St.   249.63m.        
Valdevia St.   135.60m.        
Medina St.   96.45m.        
Ducay Road   151.96m.        
Solidarios Way   84.56m.        
D'Rec Press Way   104.10m.        
Atienza Ave.   190.70m.        
Portuguese Compound   119.35m.        
Luzuriaga St.   118.43m.        
Burgos St.   300.14m.        
Parola Ext.   33.00m.        
Rizal St.   323.27m.        
Campo Siete   257.00m.        
Bonifacio to Citi Homes   331.30m.        
Rizal going to Police Station       643.90m.    
Bonifacio going to Citi Homes       706.20m.    
Existing Road            
             
Total:   11,549.25m.   1,350.10m.    
    11 + 292.25 kms.        
             
F. Urban Relocation Sites       
Phase I       672.90m.    
Phase II       780.97m.    
Phase III       355.43m.    
Phase IV       994.90m.    
Main Road   1,737.07m.        
             
Total:   1,737.07m.   2,804.20m.    
    1 + 737.07 kms.   2 + 804.20 kms.    
             
G. Saint Vincent Subdivision       
Total:    1,282.20m.    2,970.34m.     
    1 + 282.20 kms.    2 + 970.34 kms.     
             
H. Saint Charles Village       
Total:     509.83m.
  2,114.20m.
   
    509.83m.   2 + 114.20 kms.
   
             
I. Villarante Village       
Total:     2,094.18m.    1,004.80m.     
    2 + 094.18 kms.    1 + 004.80 kms.     
             
J. Alger       
Total:    290.00m.    513.10m.     
             
Total Length of Roads:    28,774.62m.    12,075.97m.     
Total Length of Concrete             
& Gravel Roads:    40,850.59m.         
Percentage:    70.44%    29.56%     
             
GRAVEL ROAD
Name of Street   Width   Meters/Length
Teachers Village:
Emerald Street   6.9m   152.04m
Pearl Street   3.33m   203m
Ruby Street   4.5m   400.09m
         
St. Vincent Subdivision (Main Street)
1st Street   5.3m   335.83m   
2nd Street   5m   114.5m
3rd Street   3.95m   175.75m
4th Street   4m   205.4m
5th Street   4m   219.87m
6th Street   4.5m   229.45m
7th Street   6.06m   179.57m
8th Street   4.5m   291.85m
9th Street   4.5m   202.1m
         
St. Charles Subdivision
Block #5   5.7m   110.4m
Block #4   4.9m   110.37m
Block #3   4.9m   110.2m
Block #2   5m   109.94m
Block #1   3.9m   109.66m
         
Total:   85.58m   3,417.34m